STS AirConAssistCOOLING SIZE PLANNER

ENGINEER'S WORKSPACE

AirConAssist

Survey rooms, review the cooling estimate and record an equipment check.

User guide PDF · 3 pages

Preliminary cooling aid. Confirm final loads and selected model performance with the manufacturer's data.

Calculation basis and limitations

Quick estimate: 20 BTU/h per ft², adjusted for ceiling height, sun, occupants above two and kitchen use. This is a preliminary rule of thumb, not a cooling load design.

Survey worksheet: sensible gains are calculated from entered U-values, areas and temperature difference; glazing solar gain from entered incident W/m², g-value and shading factor; outside air from 1.2 kg/m³ × 1005 J/(kg·K) × flow × temperature difference; plus people and equipment. Inputs must reflect the intended design hour. No thermal mass, coincident peak timing, moisture/latent load, infiltration uncertainty or manufacturer correction is modelled. It is not a CIBSE admittance or dynamic simulation.

Refer to CIBSE Guide A for professional design methods. Confirm permitted indoor/outdoor combinations and actual delivered cooling with the selected manufacturer's data.

Saved jobs on this device

Jobs are stored in this browser for offline use. Export a copy before changing devices or clearing browser data.

Welcome to STS AirConAssist

Enter your name and email, then tap Save and continue above. Marketing emails are optional.

Enter your details once to use the cooling size planner.

Your details are saved in STSAssist contacts for authorised STS staff. Marketing is optional. Read how STS uses your details.