ENGINEER'S WORKSPACE
AirConAssist
Survey rooms, review the cooling estimate and record an equipment check.
User guide PDF · 3 pagesPreliminary cooling aid. Confirm final loads and selected model performance with the manufacturer's data.
Calculation basis and limitations
Quick estimate: 20 BTU/h per ft², adjusted for ceiling height, sun, occupants above two and kitchen use. This is a preliminary rule of thumb, not a cooling load design.
Survey worksheet: sensible gains are calculated from entered U-values, areas and temperature difference; glazing solar gain from entered incident W/m², g-value and shading factor; outside air from 1.2 kg/m³ × 1005 J/(kg·K) × flow × temperature difference; plus people and equipment. Inputs must reflect the intended design hour. No thermal mass, coincident peak timing, moisture/latent load, infiltration uncertainty or manufacturer correction is modelled. It is not a CIBSE admittance or dynamic simulation.
Refer to CIBSE Guide A for professional design methods. Confirm permitted indoor/outdoor combinations and actual delivered cooling with the selected manufacturer's data.
